PT Sarana Prima Multi Niaga Palm Oil Mill

Raw Calculation CPO and PK

Todate yesterday: 12/05/2026
Storage Tank No.1 (OST 1)
Ullageāˆ’=
Dippāˆ’=
Volume+=
Density
FK
Temp (°C)
StockMT
Storage Tank No.2
Ullageāˆ’=
Dippāˆ’=
Volume+=
Density
FK
Temp (°C)
StockMT
Storage Tank No.3 (Non-Aktif)
Ullageāˆ’=
Dippāˆ’=
Volume+=
Density
FK
Temp (°C)
StockMT
Storage Tank No.4 (OST 4)
Ullageāˆ’=
Dippāˆ’=
Volume+=
Density
FK
Temp (°C)
StockMT
P.O.T
Ullageāˆ’=
StockMT
V.C.Tcm x 0.1995=
Condensate
Rain Fall
Today
Todate
Nut HopperAverage
(MT) =
K. Silo No.1
+=Avg (MT)
K. Silo No.2
+=Total Stok Kernel Silo
Total SiloMT
Cages ProcessCages Restan
StartStopTotal H
TodayTodate
Raw Report
F.F.B. ReceivedMT
F.F.B. ForwardMT
F.F.B. TotalMT
F.F.B. BalanceMT
F.F.B. ProcessMT
Operations
Run Hours
Throughput (TPH)
C.P.O DispatchMT
P.K DispatchMT
Shell DispatchMT
Stock
C.P.O Open StockMT
P.K. Open StockMT
Shell Open StockMT
C.P.O. Close StockMT
P.K. Close StockMT
Shell Close StockMT
Produced
C.P.O. ProducedMT
P.K. ProducedMT
Shell ProducedMT
Extraction Rates
% O.E.R
% K.E.R
% S.E.R
Declared Yesterday
CPO
PK
SHELL
Kernel Bunker No.1
Hole 1
Hole 2
Hole 3
Hole 4
Hole 5
Averageāˆ’:
(MT)
Kernel Bunker No.2
Hole 1
Hole 2
Hole 3
Hole 4
Hole 5
Averageāˆ’:
(MT)
TankFFAMoistDirtTemp.
ST 1
ST 2
ST 3
ST 4
Oil Prod.
Despatch
PK Prod.
Moist
Dirt
Unripe
Remarks
Saving/Utang CPO =Saving/Utang PK =OER Aktual = 0.00%KER Aktual = 0.00%
Drain =Oil Transfer =OER Flowmeter = 0.00%[= (Oil Transfer − Drain) / FFB Process × 100%]

Oil Sounding Tank Calculator

OST 1 - Oil Sounding Tank 1

Input Data Sounding

Hoil = 926.5 - (Ha - Hb) = 0.0 cm

0.000 L
0.000 L
1.0000000

Volume Oil = 0.000 liter

Density = 0.0000

VMT = 0.000 MT

šŸ”— Sinkronisasi Dua Arah: Terhubung dengan Raw Calculation ST1 (bolak-balik)

Hoil vs Volume

HoilVolume (L)
HoilVolume (L)

Temperature vs Density

TempDensity
TempDensity

OST 4 - Oil Sounding Tank 4

Input Data Sounding

Hoil = 1156.4 - (Ha - Hb) = 0.0 cm

0.000 Liter
0.000 Liter
1.0000000

Volume Oil = 0.000 liter

Density = 0.0000

VMT = 0.000 MT

šŸ”— Sinkronisasi Dua Arah: Terhubung dengan Raw Calculation ST4 (bolak-balik)

Hoil vs Volume

HoilVolume (L)
HoilVolume (L)

Temperature vs Density

TempDensity
TempDensity
šŸ” Zoom100%
šŸŒ™